    Work has been stopped on this project. Some of the workers tested virus positive. Will effect completion date.

  • avatar
    • 2 weeks ago
    • Peter

    Going down to a great depth 06/09

  • avatar
    • 2 weeks ago
    • Peter

    Glyn Bowen. bottom right. looks back

  • avatar
    • 2 weeks ago
    • Kevin

    Hi Glyn, just lucky with the timing but I probably do spend too much time on here, maybe once the work is completed it won't be quite as interesting watching all the cars wizz by. I'm expecting a change of road direction once the tarmac is finished, perhaps even this weekend.

  • avatar
    • 2 weeks ago
    • Glyn Bowen

    Hi Kevin. That was good timing or you spend too much time watching the webcams!

  • avatar
    • 2 weeks ago
    • Kevin

    Hi Glyn Bowen, I was looking at it when the camera technician spun it round, it was a long shot at first but then he zoomed it in to where it is now.

  • avatar
    • 2 weeks ago
    • Glyn Bowen

    Interesting new camera on Infastructure Malta site.

  • avatar
    • 2 weeks ago
    • Mary-Anne Kingscott

    Dave S, those are pedestrian walkways. I think there is going to be 3 walkways.

  • avatar
    • 2 weeks ago
    • DaveS

    JCC, from looking at the Infrastructure Malta website, these structures are seen at a few points around the Marsa junction. To me, they look like high level pedestrian walkways. If you look at that website and open the cam at Sir Paul Boffa Avenue, you get a good close up of work being undertaken on one of these walkways

  • avatar
    • 3 weeks ago
    • Ian

    Beneath the new roads and the flyovers, Infrastructure Malta is laying 15 kilometres of underground electricity, water, sewage, Internet and telecommunications services cables and duct routes. A storm water system, including a new reservoir, is also under construction. Rainwater from the reservoir will be used to water the new trees and the landscaped areas that the agency is preparing to embellish the Marsa Junction Project site.

  • avatar
    • 3 weeks ago
    • JCC

    Still not sure the reason for that construction. Control and maintenance centre for the whole project?

  • avatar
    • 4 weeks ago
    • Peter

    If only we could see down the hole 26/8

  • avatar
    • 1 month ago
    • JCC

    That would be below sea level in that part of the island.

  • avatar
    • 1 month ago
    • Peter

    Going down a long way with that hole 15/8

  • avatar
    • 1 month ago
    • JCC

    Big hole being dug by big CAT

  • avatar
    • 2 months ago
    • DaveS

    Is all coming together now, the end is in sight, and when you look back to the hours sat in traffic jams before, the change, is so good.