Kappara, Sliema Road - enemalta ISUB Station live camTraffic monitoring on Roundabout and Sliema Road, direction Tunnel for St. Julian's

Hosted by
hosted by
In collaboration
Tansport Malta Malta Police

Comments

  • avatar
    • 6 days ago
    • DaveS

    https://www.timesofmalta.com/articles/view/20170917/local/second-kappara-junction-bridge-opened-for-traffic.658218
    Great News

  • avatar
    • 3 weeks ago
    • Louis Pace

    https://www.youtube.com/watch?v=v1FLbpEqPns

  • avatar
    • 3 weeks ago
    • Louis Pace

    http://www.timesofmalta.com/articles/view/20150701/local/pictures-eu-allocates-39m-for-new-marsa-addolorata-junction.574725

  • avatar
    • 1 month ago
    • Veritas

    While the Kappara team admirably work incessantly, the Xarolla team is on a long snooze break!

  • avatar
    • 2 months ago
    • Veritas

    Heartfelt Great Well Done to the Kappara team.
    In contrast, a 500 metre road (Vjal ix-Xarolla Zurrieq) one year in the making ... a World record.
    Once Vjal ix-Xarolla is finished, both local band clubs and the National Philarmonic will be giving a 24 hour performance!

  • avatar
    • 2 months ago
    • TRAFFIC

    http://www.maltatoday.com.mt/news/national/78435/kappara_flyover_to_open_for_traffic_in_september#.WYWUvIiGOUk

  • avatar
    • 2 months ago
    • TRAFFIC

    Next Roads Project.
    https://www.timesofmalta.com/articles/view/20150701/local/pictures-eu-allocates-39m-for-new-marsa-addolorata-junction.574725

  • avatar
    • 2 months ago
    • TRAFFIC

    https://www.timesofmalta.com/articles/view/20170725/local/watch-first-lanes-of-kappara-junction-to-open-tonight.654101

  • avatar
    • 2 months ago
    • TRAFFIC

    https://www.timesofmalta.com/articles/view/20170725/local/watch-first-lanes-of-kappara-junction-to-open-tonight.654101

  • avatar
    • 2 months ago
    • DEREK JAMES BEVAN

    they might have it finished for my next visit.

  • avatar
    • 2 months ago
    • TRAFFIC

    One Lane on the Flyover opened.

  • avatar
    • 4 months ago
    • scotsguy

    Very small crane to for such a wide/long lift !

  • avatar
    • 4 months ago
    • Mex

    Further details go to this link https://news.transport.gov.mt/kappara-the-second-bridge/

  • avatar
    • 4 months ago
    • Mex

    Kappara: the second bridge
    The remaining eight steel girders that will support the bridge deck and that will be placed throughout the whole extent of the flyover, will be transported from Marsa to Kappara at night tomorrow Saturday and on Monday 15th, Tuesday 16th and Wednesday 17th of May.

    The trailers will leave Dock 7 in Marsa at 19:30hrs and will proceed from Triq il-Labour, Triq Aldo Moro, Marsa-Ħamrun bypass, Santa Venera tunnels, Triq Reġjonali and Triq Mikiel Anton Vassalli. The trailer will be driving on the right hand side carriageway since it is easier to manoeuvre. These roads will be closed in segments to allow drivers to drive through alternative routes